Plumbing Repair & Pool Entry

Residents,

Starting on Monday, June 29, work will begin to repair the clubhouse plumbing system. Because of this, we will be closing the normal entrance to the pool while these repairs are being done. To enter the pool, we ask that you enter through the gate located at the top of the slide. We will have a lifeguard in place acting as a gate attendant to check for keycards and assisting with the opening of the door. 

Lastly, do NOT cut through the construction zone to get to the basketball court or the back tennis courts. Politely go through the pool deck and exit through the back gate facing the playground. 

How long will the repairs take? Georgia Plumbing says the repairs could take a few as 2 days and as long as a week. Normal pool entry will be allowed when the caution tape is removed. 

Thank you for your patience.

Hampton Station HOA Board

Leave a Reply